Your campaign is approved, the crew is quoted and the locations are shortlisted. Then someone asks the question that decides whether any of it happens: who is getting the filming permit, and when?
A brand shoot in Dubai needs permission before the first camera switches on. You cannot apply for the Dubai filming permit yourself unless your company holds a UAE production trade licence. The Dubai Film and TV Commission (DFTC) is the single office that issues filming permits, and it requires a UAE-licensed production company to act as the applicant. Standard permits usually clear in a few working days, script approval for films and documentaries can take up to 25 working days, the application fee is AED 520, and private locations charge their own fees from AED 0 up to AED 25,000 a day. Drones need separate aviation approval on top. Clear these approvals before you book crew, and your shoot stays on schedule.
THE SHOOT AT A GLANCE
One application can cover multiple days and locations; verify the category and venue costs for your shoot.
Quick Decision Guide: Do You Need a Permit, and Who Gets It?

Why the Permit Question Comes First
Picture a marketing manager at a mid-size UAE brand. A production company has quoted a two-day shoot for early November: one morning at Dubai Marina, one afternoon at a DIFC plaza. Crew booked, talent cast, flights paid.
Three days before the shoot, someone finally asks about the permit. The production company says it can apply, but the marina and the plaza sit under different authorities, one needs a written NOC, and approvals move in working days, not hours. The shoot slips — and rescheduling costs the brand its talent day rates and a launch date.
This scenario is avoidable. Every commercial shoot in public, government-operated or privately operated locations needs a permit from the DFTC, which coordinates approvals with every department and venue owner involved. When brands treat permits as end-of-process paperwork, the paperwork ends up controlling the calendar.
The stakes go beyond a slipped date. Filming without a permit carries fines, and crews can be stopped on location — a crew on the clock, a burned location relationship, and footage you legally cannot use. The fix is boring and effective: clear the approvals before you commit money.
How Dubai Filming Permits Actually Work
The DFTC is the single door
The Dubai Film and TV Commission is the only entity authorised to issue a Dubai filming permit for audio and visual media production, and to collect the related approvals from government departments and private location owners. That covers television, film, radio, online and mobile content, print and photography — including advertisements, corporate videos and stills. If your brand is producing content, this is your process.
Only a UAE-licensed production company can apply
This is the rule most brands miss. DFTC does not issue filming permits directly to international companies. Any individual, company or entity that wants to film in Dubai must appoint a UAE-licensed production company to obtain the permit, and a commissioning letter appointing that company is part of the application. If your brand has no UAE production trade licence, the production company is not an optional vendor — it is your legal route to filming at all.
Script approval comes first for scripted work
Feature films, TV series and documentaries need script clearance from the DFTC before a permit application can be submitted. Individuals and international companies can submit scripts directly for approval. The full script must be lodged with shooting dates and locations, no changes are allowed after submission, and approval takes up to 25 working days. A brand commercial or corporate video generally does not pass through the same full script-clearance gate — a pre-booking decision, not a post-booking one.
Location approvals stack on top
The permit covers the location categories you list. Private venues — hotels, malls, developers like Emaar and Nakheel, and DIFC — require a no-objection certificate from the owner, and owners set their own location fees. Government locations follow a published fee schedule. Sensitive sites such as government buildings, airports and mosques take longer to clear. You may only film in the areas and time periods approved on the permit.
Drones are a separate approval
Aerial work needs clearance from the aviation authorities — the Dubai Civil Aviation Authority (DCAA) and, federally, the GCAA — and that application is separate from the ground permit. Drone approvals run in parallel, not afterwards, so they belong on the same pre-booking timeline. For the hiring side of that decision, see our guide to hiring a drone photographer in Dubai.

Who does what: brand, production company, fixer
When you brief a production company, ask one question early: who is the applicant of record on the DFTC permit? If nobody can answer that, your timeline is not real yet.

What the Approvals Cost (Verified Fees)
Permit money sits in three separate buckets, and confusing them causes most of the online confusion.
Swipe or scroll the table to view all columns →
| Cost item | Verified amount (2026) | Notes |
|---|---|---|
| DFTC application fee | AED 520, non-refundable | Per application; one application can cover multiple days and locations |
| Government location fee, advertisements | AED 2,500 | UAE-licensed production company, up to 30 days, per the Executive Decision No. 50 fee schedule reported by Khaleej Times |
| Corporate content location fee | AED 2,500 | Videos up to 7 days; stills or city footage up to 14 days |
| Aerial filming location fee | AED 0 | Up to 7 days; aviation approvals and operator costs are separate |
| News location fee, UAE-licensed broadcaster | AED 0 | Foreign broadcasters pay AED 2,500, up to 14 days |
| Script approval | Free, per the DFTC FAQ | Films, TV series and documentaries; up to 25 working days |
| Private location fees | AED 0–25,000 per day | Owner-set; may include cleaning, security and services. Landmark operators such as Jumeirah, Emaar, Nakheel and DIFC publish rate cards; others quote per production |
Two honest caveats. First, several industry sources also cite a widely reported AED 2,520 public-area permit figure; the authoritative Khaleej Times breakdown of the Executive Decision fee schedule lists AED 2,500 location-fee categories, and the AED 520 is the application processing fee. Confirm your exact category on the DFTC portal. Second, road closures, security, insurance and the production company service fee are quoted per shoot. Fees change; verify current figures before you budget.
The Practical Path: Applying Without Losing Weeks
Once you know the rules, the path is short. Do these six steps before signing crew or location contracts:
- Pick your category honestly. Advertisement, corporate content, stills or aerial — each has its own fee and duration. Match your shoot to the right one before applying.
- Appoint the licensed production company. Sign the appointment and prepare the commissioning letter. Confirm they hold a valid UAE production trade licence and are registered on the current DFTC portal.
- Freeze the creative. The application needs a script, synopsis or storyboard, shooting dates, exact locations, a crew list with passport and visa copies, and an equipment list including drone make, model and serial number. Submitted scripts cannot be changed, so lock the concept first.
- Collect the NOCs. Every private location owner signs a no-objection certificate. Hotels and malls often run their own written approval process on top. Sort these first — missing location letters are the most common reason packs stall.
- Start the drone track in parallel. If aerial shots are planned, begin the DCAA and aviation approval at the same moment as the ground permit, through the same licensed partner.
- Submit, pay and keep the permit on set. Payment is online on the portal. When the permit lands, a copy stays with the crew at all times, and filming happens only in the approved areas and time windows.
Timing, honestly stated: the DFTC FAQ lists permit approval at one working day, subject to location owners’ approval, and registration at two working days. Industry sources consistently report two to five working days for standard complete applications and up to ten working days for sensitive locations. The safe planning rule for a branded shoot with real locations and a possible drone: start four to six weeks out.
The Brand-Side Pre-Shoot Permit Checklist
Copy this worksheet into your production tracker. Every row is a gate that must be green before money is committed — that discipline is the essence of the Dubai filming permit process. The centre column shows who owns each item; the right column is where you file the evidence.
Swipe or scroll the table to view all columns →
| No. | Checklist item | Owner | Evidence to file before booking |
|---|---|---|---|
| 1 | Content category confirmed (advertisement, corporate, stills, aerial) | Brand + production company | Written category decision in the brief |
| 2 | UAE-licensed production company appointed | Brand | Signed appointment and commissioning letter |
| 3 | Script, synopsis or storyboard frozen (scripted formats) | Brand | Final script with dates and locations; approval status if applicable |
| 4 | Shooting schedule with exact locations and time windows | Production company | Schedule matching the permit application |
| 5 | Crew list with passport and visa copies; visa route confirmed | Production company | Crew manifest |
| 6 | Equipment list including drone make, model and serial number | Production company | Equipment manifest |
| 7 | NOC from every private location owner | Production company or fixer | Signed NOCs on file |
| 8 | Public liability insurance in place | Production company | Insurance certificate |
| 9 | DFTC application submitted; AED 520 fee paid | Production company | Application reference and receipt |
| 10 | DCAA drone approval started in parallel (if aerial) | Production company | Application reference |
| 11 | Sensitive-location checks done (government buildings, airports, mosques, residential communities) | Production company | Authority confirmation or revised location |
| 12 | Restricted-area screen: no ministries, palaces, military sites or refineries in the shot list | Brand + production company | Shot list marked against the restricted list |
| 13 | Permit received; copy assigned to set for all shoot days | Production company | Permit document and set contact |
| 14 | Brand-side approvals cleared so post-submission script changes are not needed | Brand | Internal sign-off email |
Rows one to eleven belong in the pre-booking phase. If your production company asks for crew deposits before rows two, seven and nine exist, you are carrying their timeline risk. Push back politely and get the pack moving first.

Two Shoots, Two Timelines (Hypothetical Examples)
Both examples are illustrative and clearly hypothetical; the names are invented.
Common Rejection Reasons and Costly Mistakes
DFTC reserves the right to request additional documents and to reject applications. In practice, rejections and stalls trace back to a short list of causes:
- Wrong applicant. A brand or international agency tries to apply directly. Only a UAE-licensed production company can be the applicant.
- Missing or mismatched documents. The pack needs the script or synopsis, schedule, crew passports and visas, equipment list, insurance and NOCs. Missing insurance or location letters are the most common stall points, and missing documents restart the clock.
- Script changes after submission. No changes are allowed once a script is submitted. Internal marketing sign-off must happen before, not after.
- Restricted locations in the shot list. Government departments, ministries, royal palaces, military outposts and refineries are off-limits. A shot list that includes them stalls at review.
- Treating the minimum as the plan. The official minimum lead time only works for the simplest jobs. Sensitive sites, drones and script approvals stack. Budget weeks, not days.
- Permits treated as one bucket. Ground, aerial and venue approvals are separate tracks with separate clocks. Sequencing them instead of running them in parallel quietly doubles the timeline.
- Filming outside the approved scope. The permit covers specified areas and time periods only. One more quick shot outside the permit is how crews get stopped.
One number worth knowing: fines for filming without a permit in Dubai are real and enforced. Exact amounts vary by violation and authority, so do not budget on a guess — verify with your production partner. The cheaper option is always the permit.
The Decision, Put Simply
Here is the whole decision in one breath. If your brand is producing commercial content anywhere in Dubai outside a fully private, non-public setting, you need a DFTC permit through a UAE-licensed production company, plus owner NOCs for private venues, plus separate DCAA approval for drones. The application fee is AED 520; location fees run from zero to AED 25,000 a day depending on the site; standard approvals take a handful of working days and complex stacks take weeks. None of this is hard. All of it is sequencing.
So invert the usual order. Instead of booking crew and locations and then discovering the permit chain, clear the checklist above first, then commit the money. The brands that shoot on schedule in Dubai are not the ones with the best fixer contacts. They are the ones that started the paperwork six weeks before anyone bought a plane ticket.
How Gulf Got Talents Fits In
Once the approvals are on track, the next question is people: who is in front of the camera and behind it? Gulf Got Talents is a UAE talent marketplace where brands browse and book verified models, actors, photographers, videographers and crew directly. If your shoot needs on-camera talent, you can browse verified photographers and video talent on GGT. If you are producing content yourself and want the crew side covered, our guide to how production companies hire film crews in UAE explains the roles that matter. And once the creative is cast, our roundup of the best production houses in UAE helps you choose the licensed partner who will be your applicant of record.
Frequently Asked Questions
1. Do I really need a filming permit for a brand shoot in Dubai?
Yes, for commercial media production on public, government-operated or privately operated locations, including streets, beaches, malls, hotels, parks and landmarks. A Dubai filming permit is not needed for the DFTC FAQ’s listed exceptions: weddings, events, educational purposes, press conferences and purely personal filming.
2. Can my brand apply for the permit itself?
Not unless your company holds a UAE production trade licence. Any individual, company or entity that wants to film in Dubai must appoint a UAE-licensed production company, and DFTC does not issue permits directly to international companies.
3. What is the Dubai Film and TV Commission?
DFTC is the Dubai government body, established under Executive Decision No. 50 of 2014, that acts as the one-stop shop for filming in the emirate. It is the sole entity authorised to issue filming permits and to obtain related approvals from government departments and private location owners.
4. How much does a filming permit in Dubai cost?
The application fee is AED 520, non-refundable, covering multiple days and locations in one application. Government location fees follow a published schedule; private location fees are owner-set, from AED 0 up to a maximum of AED 25,000 per day.
5. How long does approval take?
The DFTC FAQ lists permit approval at one working day, subject to location owners’ approval. In practice, industry sources report two to five working days for standard complete applications and up to ten working days for sensitive locations. Script approval takes up to 25 working days.
6. Do I need script approval for a TV commercial?
Script clearance through DFTC applies to TV series, films and documentaries. A brand advertisement or corporate video generally follows the permit path with a synopsis, script or storyboard in the application pack, but confirm your category with your licensed production partner first.
7. What is an NOC and when do I need one?
A no-objection certificate is written permission from a location owner. An NOC is required before filming on any private location, including hotels, malls, developments and free zones. Venue owners may also run their own approval process on top, and they set the location fee.
8. Is a drone permit separate from the filming permit?
Yes. Aviation clearance runs through the Dubai Civil Aviation Authority (DCAA) and, federally, the GCAA, and is separate from the ground permit. Aerial and ground filming can go into one DFTC application, but the approvals run in parallel — start them at the same time.
9. Can international crew work on the shoot?
Yes, but international crew may only arrive on site after script approval (where required) and permit issuance, and the UAE-licensed production company procures work or business visas for all crew involved. Build visa lead time into your schedule.
10. Where exactly can I not film?
Restricted areas include government departments, ministries, royal palaces, military outposts and refineries. Sensitive sites such as airports, mosques and government buildings take longer to clear. Your shot list should be screened against these before submission.
11. What happens if we film without a permit?
Filming operations are not allowed without a permit, and crews can be stopped on location with fines applying. Exact fine amounts vary by violation, so treat unpermitted filming as a hard no rather than a calculated risk.
12. How many days does one permit cover?
It depends on the category: advertisements up to 30 days, corporate video up to 7 days, corporate stills up to 14 days and aerial filming up to 7 days. One application can include multiple days and multiple locations.
13. Is script approval free?
Yes. Per the DFTC FAQ there is no charge for script approval itself. The cost sits in the up-to-25-working-day review window and in freezing your script before submission, because no changes are allowed after.
14. How far in advance should a brand start the Dubai filming permit process?
For a simple studio or single-location shoot, two weeks can be enough. For a branded shoot with multiple real locations, private venue NOCs or drone work, start four to six weeks out, because approvals stack rather than overlap neatly.
Final Word and Your Next Step
Dubai makes branded shoots genuinely easy to film if you respect the order of operations: permit first, bookings second. Clear the licensed-applicant appointment, the creative freeze, the NOCs and the drone track, then file the checklist above before any deposit is paid. The AED 520 application fee is the cheapest line in your production budget; the delays are the expensive part.
READY FOR THE NEXT STEP?
Ready to cast the shoot once the paperwork is moving?
Browse verified photographers, videographers and creative talent →
Brief them against the permit checklist above.
Keep Reading
- Drone Photographer Dubai: How to Hire Operators and Clear DCAA Permits
- Film Locations in Dubai: Top 20 Shooting Spots with Permits Guide
- How Production Companies Hire Film Crews in UAE
- Best Production Houses in UAE: Top Film and Ad Companies
Information accuracy note: permit fees, timelines and rules are time-sensitive and were last checked 11 November 2026 against DFTC official pages and UAE press reporting. Confirm current requirements for your specific shoot with your licensed production partner or the DFTC portal before committing budgets.